ROOFING NEWBURY PARK – INSTALLATION JOB REFERENCE
ROOFING NEWBURY PARK: PROJECTS BY ALL CLIMATE ROOFING
525 ROLLING MEADOW CT, NEWBURY PARK
Tile Re-roof
We lifted all the tiles on the entire roof for this roofing Newbury Park job. We then removed all 1”x3” wood trim/tile risers; replaced all rusty tile pan adjacent to counter flashings; added double layers of felt underlayment to all areas except around valley drainage metals and vent pipes adding triple layers of felt underlayment ; replaced all vent pipes and valley metals; installed new 2” x 2” edge metals and tile risers; installed new 24” air dormers; increased roof pitch at the flat roof section to improve drainage; re-installed all original tiles and replaced all broken tiles; pressure washed the entire roof..
3380 BEAR CREEK DR., NEWBURY PARK
Tile Re-roof
3000 sq ft flat tile re-roof using double layers of 40 pound felt underlayment; replaced 80 ft fascia board due to termite and water rot damage; replaced 500 ft of shiplap under eves; replaced 50 ft of siding.
612 SILVERWHEEL PLACE, NEWBURY PARK
Flat Roof Repair
For this flat roof repair project when roofing Newbury Park, we handled approx. 400 sq. ft of existing flat roof materials. We removed and replaced approx. 96 sq. ft. of 1/2” CDX plywood; removed and replaced approx. 16 ft of 1”x8” primed and treated shiplap; added double layers of 40 pound fiberglass underlayment;
added Flintlastic torchdown materials by CertainTeed to entire flat roof; added approx. 30 ft of custom-galvanized flashing to stucco wall.
667 PASEO DE LEON, NEWBURY PARK
Tile Roof Drainage System Repair
Removed 200 sq ft of flat concrete tiles; replaced 20 sq ft wood rot-damaged plywood; added double layers of 40 pound felt underlayment to the repaired area; re-installed original tiles; upgraded all drainage valleys 3” – 4” wider to allow for drainage.